From factory to keys

Two tracks run at the same time. The home is built indoors while the slab and services are prepared on your lot. Delivery is 6 weeks from order. The on-site install is 7 days.

Factory track

1. Discovery and the Coach House Wizard. 2. Design and a fixed quote. 3. Factory build with quality checkpoints and photo updates. 4. Delivery.

Your home is never rained on while it is being built. Rain, snow, and freeze-thaw do not stop work inside the plant. We do not have a Canadian percentage for that weather advantage, so we state it as a reason, not a statistic.

Site track

Permits (we prepare drawings and the submission), servicing, and the insulated slab-on-grade pour happen while the factory is building. The Ontario Building Code allows a foundation above frost depth when it is designed against frost action.

On set day a crane lifts the walls and roof onto the slab. The shell is closed in during the 7-day install, then finishing and inspections, then keys.

Permits are not inside the 6-week clock. The slab is poured during the factory build. See Build Season for when a pour is comfortable in your region.

See the pour season →