Why Solisterra
Outcomes first: a finished home, a known date, a quiet envelope. The factory is how we get there.
Whole-shell speed
Every wall and the roof are built in our factory as complete, insulated sections. On site they are lifted into place and sealed, so the shell goes up within the 7-day install instead of weeks of framing. Quality is checked before the home leaves the plant.
Published modular research (McKinsey) finds project timelines 20 to 50 percent faster. Foundation time itself does not shrink. Our company figures are 6 weeks from order to delivery and a 7-day install, with the slab poured in parallel.
The envelope
Walls and roof are built as continuous insulated assemblies with high R-values and very few thermal bridges, so the home is quieter and uses less energy. Studies of offsite construction have found on the order of 80 percent less construction waste. We do not quote a fixed cost-saving percentage: logistics can erase labour savings.
One team
Permits, foundation, set, and finishes sit under one contract. A technical package for architects and inspectors can describe the wall assembly in more detail. We do not lead with product jargon on this site.