Solisterra Homes
Call

Ottawa / Gatineau · Ontario & Québec

Built in the factory. Installed in 7 days.

Solisterra designs and builds complete turnkey homes and coach houses in our factory, delivers them 6 weeks from order and installs them on your lot in 7 days. Less weather risk, less waste, and an exceptionally warm, quiet, efficient home. Serving Ontario and Québec.

What we build

How it works

  1. 01

    Check your lot

  2. 02

    Design and fixed price

  3. 03

    Permits, while the slab is poured

  4. 04

    Factory build

  5. 05

    7-day install, then keys

Can my lot fit a coach house?

Find out in about two minutes. The same Coach House Wizard that scores our launch models.

Why Solisterra

Speed

Every wall and the roof arrive factory-made, so the whole shell goes up within a 7-day install, square, tight, and weather-sealed.

Design

A fixed lineup you can see before you order, from a 282 sq ft studio to plans that will grow toward 3,500 sq ft.

Comfort

A factory-sealed, continuously insulated building envelope with high R-values. Quieter rooms, less energy.

Price certainty

The home is priced before it is built. We do not promise a fixed percent saving. We do promise a known scope.

Less disruption

Neighbours see a crane and a short install, not a season of framing.

Walls and roof, built in the factory. Up in a week.

Every exterior wall and every roof section is built in our factory as a large, insulated panel, cut to the millimetre and quality-checked indoors. On install day a crane lifts each panel onto your slab. The walls lock together, the roof panels go on top, and the home is closed in and weather-tight almost immediately. That is how we go from delivery to a finished home in a 7-day install.

A foundation built for speed.

Every Solisterra home sits on an insulated, frost-protected concrete slab, not a full basement. That means less digging, less concrete, fewer trades, and a much shorter site schedule. The slab is poured while your home is being built in our factory, so when it arrives 6 weeks after you order, the base is ready and we install it in 7 days. A slab also gives you a step-free, single-level floor (useful for aging parents) and a warm floor, because the slab is insulated underneath and at its edges.

Ontario Building Code 4.2.4.4 — foundations may sit above frost depth when designed against frost action.

Who it's for

Family nearby

Aging parents or adult children, with a step-free main floor on a slab.

Rental income

A 1-bed garden suite in Toronto can rent for roughly $2,100–$2,900 a month.

Cottage and rural

The house is built indoors, which matters where trades and weather are scarce. Private services can limit the unit count.

Builders

Repeatable models and a schedule you can finance. See the page for small developers.

A first look at the numbers

A 1-bed garden suite in Toronto can rent for roughly $2,100–$2,900 a month. That is an industry estimate, not a promise and not a CMHC figure. 3

Run the numbers →

Launch models

These six FastUP designs are the same ones the Coach House Wizard checks against your lot. More sizes are coming.

Projects

Photography will replace this note after the first installs. Until then, the models and the lot wizard are the honest preview.

Questions we hear first

Is this a mobile home?

No. It is a permanent home on a foundation, built to code. It is not a trailer and it is not a kit you finish yourself.

How long is the crew on my lot?

The on-site install is 7 days. Delivery is 6 weeks from order. Permits and the slab happen in parallel with the factory build, before the home arrives.

Do you handle permits?

Yes. Drawings and submission are part of the turnkey scope. The municipality still has to approve them, so permit time sits outside the 6-week factory clock.

Can I finance it?

Many owners look at the CMHC refinance for a secondary suite, a HELOC, or construction financing. The federal $80,000 secondary suite loan was cancelled and never launched.

Order the home. We'll meet you at the slab.

Call 613-591-9990 or check the lot. We work from Ottawa / Gatineau across Ontario and Québec.

613-591-9990
  1. 1 McKinsey, Modular construction: From projects to products — schedules 20–50% faster.
  2. 2 ASCE Journal of Management in Engineering — offsite projects cut construction waste by about 78.8% on average across 59 projects. Earlier case studies found 81–83%.
  3. 3 Industry estimate for Toronto garden-suite rents (1-bed about $2,100–$2,900/mo). Not a CMHC statistic.
  4. 4 Ontario Environmental Registry 019-6163 — Bill 23, up to three units as-of-right on serviced residential lots.
  5. 5 Ontario Building Code 4.2.4.4 — foundations may sit above frost depth when designed against frost action.
Built in the factory. Installed in 7 days. · Solisterra Homes